Automated Assembly line

Double robot cell directly on the injection molding machine in a cleanroom environment

  • ABB robot  takes part 1 out of the injection mold
  • Post-processing of part 1
  • Buffer belt for cooling part 1
  • Part 2 has been deposited in bulk and is supplied by means of a vibratory feeder
  • ABB Robot 2 assembles the 2 parts which are then assembled
  • Inspection through vision. Correct assembly, dimensions and contamination are included in the check.

The recording below was made during the FAT tests

.